• Hhrsl

Tower of London Middle Drawbridge

The design of a replacement working bascule drawbridge at the Tower of London including the replacement of the fixed bridge section based on the design of the 1914 drawbridge, but to meet current health & safety requirements. Completed April 2014. With structural engineers Hocley & Dawson.
Contract Value: £350,000

Andy Burrell Director

Bridge Lifting 1
Bridge Long
Midddle Drawbridge