• Hhrsl

Tower of London Middle Drawbridge

The design of a replacement working bascule drawbridge at the best essay writing Tower of London including the replacement of the fixed bridge section based on the design of the 1914 drawbridge, but to meet current health & safety requirements. Completed April 2014. With structural engineers Hocley & Dawson.
Contract Value: £350,000

Andy Burrell Director

Bridge Lifting 1
Bridge Long
DSC02986
Midddle Drawbridge